![]() The studio sits on a rise above the house. Here is the foundation from afar, with the 12x12 beams stacked on the graded site (May). The excavation work and sonotube foundation were done in summer of 2003. |
![]() Here are the same beams stacked at the graded site, looking down at the house. Note the sonotubes (round cement pillars) peeking out of the dirt. The beams are laid on the tubes and bolted in place. The flat stones in the foreground will be steps to the door on the porch, May, 2004. |
![]() The beams in place on the sonotubes, with two of the floor joists standing. The floor joists are 2"x12"x20' and were green when we moved them in place. Talk about heavy!(mid-June) |
|