The Building of Lisa's Studio-pg. 12, 2003-04
p1 | p2 | p3 | p4 | p5 | p6 | p7 | p8 | p9| pg 10 | pg 11| page 12 | pg 13 | 2006
The trim is finished, painted and installed, the staging down and the leaves are having their last hurrah! Oct. 15th.

 
Tim is wiring as the weather gets cold and he waits for the windows and doors he has ordered to come in. October 20th.
 
Storage door under the eaves making a large, albeit low, space for stuff in the attic of the studio.


The frost is on the pumpkin. It is 7:30 am and the studio is awash with first light, October 25th.

Next

p1 | p2 | p3 | p4 | p5 | p6 | p7 | p8 | p9| pg 10 | pg 11| page 12 | pg 13
last revised 10-30-04 LB