The Building of Lisa's Studio-pg. 13, 2003-04
p1 | p2 | p3 | p4 | p5 | p6 | p7 | p8 | p9| pg 10 | pg 11| pg 12 | pg 13 | 2006
Summer 2006

The panes are "barn sash" bought w/o jambs to save money. Tim is custom building the jambs for all the windows, in his shop. They'll hinge to open fully and latch with brass fittings. October 30th.
 
Two windows in place on a frosty November 13th afternoon around 3pm. The sun is already dropping behind the hill behind the studio.


Above: two huge sliding doors have been delivered (Nov 9). This one has a small crack in the jamb which Tim will have to fix and/or wait 10 days for the replacement strip of wood.

Right: Tim installing the "good" door inbetween the porch area and the studio area. Lisa and Gracie testing out the newly installed door on a frosty Nov. 13th afternoon.

 