The Building of Lisa's Studio-pg. 3, 2003-04
p1 | p2 | page 3 | p4 | p5 | p6 | p7 | p8 | p9 | p10 | pg 11 | pg 12 | pg 13 | 2006

The second wall goes up, July 17.

The 2 large rectangles to the left, in this wall will be windows in the studio and the larger hole on the right will be a porch window.

7am - July 23 (Uriah's birthday) the first gable end is raised by Tim and Lisa


Master carpenter, Tim Dalton!!

Next.......

p1 | p2 | page 3 | p4 | p5 | p6 | p7 | p8 | p9 | p10 | pg 11 | pg 12 | pg 13

last revised 8-6-04 LB