The Building of Lisa's Studio-pg. 8, 2003-04
p1 | p2 | p3 | p4 | p5 | p6 | p7 | page 8 | p9| p10 | pg 11 | pg 12 | pg 13 | 2006

Last day for rafters, Aug. 14. Lisa, left, on staging holding rafter in place while Tim nails other end. Above, finished rafters from inside studio.



Left, finished rafters from the outside. Above, Tim screwing the "outriggers", rafters for the roof overhang, into the ridgepole.

next

p1 | p2 | p3 | p4 | p5 | p6 | p7 | page 8 | p9| p10 | pg 11 | pg 12 | pg 13
last revised 8-14-04 LB